Ajaks
oferta usług specjalistycznych

pigging – cleaning of long pipelines

Thanks to the possibility of connecting few Double-Pigging Units together we are able to clean pipelines of length up to 100 km. This technology is mainly used in case of long, welded, often underground pipelines or in case of hard sediments and when the time of work execution is really short. Pigging of pipelines is conducted in closed circuit what is extremely significant for the environment protection. The waste after industrial cleaning, including the dangerous one, is safely utilized according to the existing regulations.

Przedsiębiorstwo Specjalistyczne AJAKS SA
ul. Ostrowska 366 / 374a
61-312 Poznań

tel. 61 870 50 15
fax 61 879 86 30

This email address is being protected from spambots. You need JavaScript enabled to view it.

Office Płock:
This email address is being protected from spambots. You need JavaScript enabled to view it.

Office Germany:
This email address is being protected from spambots. You need JavaScript enabled to view it.

 


AJAKS SA
THE PROUD SPONSOR OF
SPR WISŁA PŁOCK

Polish Champion

in Handball